Casement door construction technology

The construction process of the casement door is as follows:


I. Process flow: find the rules of the elastic line → door opening processing → casement door processing → casement door transportation, positioning → casement door frame installation → → plugging around the doorway → casement door installation → hardware accessories installation → cleaning, acceptance


Second, the operation points:


1. Finding the rules with the elastic line: Find the doorline at the high level, draw down the doorline with a large wire drop, and draw a line at the doorway of each floor to shave the edges of individual non-straight mouths. High-rise buildings can use theodolite to find the vertical line. The horizontal position of the doorway should be based on the floor + 50cm horizontal line.


2. Installation position in the wall thickness direction: Determine the installation position of the casement door in the wall thickness direction according to the large-scale drawing of the external wall;


3. Placement and temporary fixing: According to the installed installation line, hang it straight. No problem can be temporarily fixed with wooden wedges.


4. Fix with the wall: Fix the iron piece with the wall with a nail gun, and the distance between the iron pieces should be less than 600mm. At the same time, ensure that there are not less than two fixing pieces on each side.


5. Door frame caulking: After fixing the casement door, it should be caulked in time. Waterproof mortar is used for the plug seam. The base layer must be cleaned before the plug seam. Brush a plain cement slurry and use a 1: 2.5 waterproof mortar to plug the seam. It is required to be full and tight. Wedge, the same way to fill wood wedge holes.


6.Swing door installation: The door frame is connected by aluminum corner code, the specific method is the same as that of the door frame.


7. Installation hardware accessories: After the slurry is repaired, the hardware accessories of the doors and windows can be installed after the oil painting is completed. For the installation process, please refer to the product manual. The installation is required to be firm and flexible.


Up:
Down:
Back to list
Technical Support:Rya
  • No.188 Shixue Road, Zhifu District, Yantai City,
    Shandong Province
  • Tel:0535-6846120 6846130
  • Mobile:13806386636
  • Postcode:264000
  • Fax:0535-6846160
  • E-mail:[email protected]

Scan to join us

Copyright ? Yantai Okedoor Industry Co., Ltd. Welcome to inquire!
主站蜘蛛池模板: 色天天综合色天天天天看大 | 亚洲日韩在线视频 | 加勒比色老久久爱综合网 | 久久亚洲精品无码va白人极品 | 国产人妻精品无码av在线 | 日本后进式猛烈xx00动态图 | 国内精品亚洲 | 久久人妻av一区二区软件 | 草草在线视频 | 欧美亚洲第一页 | 亚洲日韩精品一区二区三区 | 亚洲精品97久久中文字幕无码 | 九九九免费视频 | 国产福利不卡一区二区三区 | 全球av集中精品导航福利 | 天堂资源在线最新版 | 久本草在线中文字幕亚洲欧美 | 国产亚洲福利精品一区 | 欧美 日韩 国产 亚洲 色 | 欧美一进一出 | 日本韩国男男作爱gaywww | 国内精品久久久久久中文字幕 | 婷婷在线综合 | 四虎在线视频 | 欧美视频精品 | 久久99久久精品国产只有 | 91综合久久婷婷久久 | 欧美熟妇丰满肥白大屁股免费视频 | 国产精品ⅴ无码大片在线看 | 久久精品道一区二区三区 | 国产乱码一区二区三区爽爽爽 | 巨乳中文字幕 | 日韩乱码人妻无码中文字幕 | 美国一级黄色 | 国产精品视频一区二区噜噜 | 女人下边被添全过视频 | 免费看日韩A片无码视频软件 | 无码少妇精品一区二区免费动态 | 午夜精品久久久久久久喷水 | 999视频在线播放777 | 日韩黄色在线观看 |